The water lifting screw shortly before transport

The water lifting screw shortly before transport

The water lifting screw shortly before transport

1005 liters per second

In future this considerable volume of wastewater will be pumped per second in a wastewater treatment plant in the Gütersloh region by the largest tubular lifting auger ever built by REHART. In contrast to “normal” pumps, foreign particles contained in the wastewater are not a problem for this auger with a length of nearly 9 meters. Therefore, this technology is often used for pumping wastewater. At present the “blue giant”, equipped with a weather protection hood, is being assembled and will be delivered soon to its destination at the wastewater treatment plant.